M5 Motorway is ready for winter maintenance

WINTER MAINTENANCE ON THE M5 MOTORWAY IN NUMBERS

156,6 km motorway section
3 operation and maintenance centres (located near Újhartyán, Kiskunfélegyháza and Balástya)
12 dual-purpose vehicles
7 multifunctional Unimogs, 3 loading vechicles
6234,47 tons of sodium chloride
18 tons of calcium chloride
Monitoring the road conditions every 2 hours during the daytime

Kecskemét north interchange closure due to construction of the M44 Expressway

Type: M5-M44 interchange construction works
Location: M5 motorway first in the direction of Budapest, then afterwards in the direction of Szeged, Kecskemét north interchange at chainage 74
Expected start of maintenance: 10th October 2024
Expected finish of maintenance: Autumn 2026
Speed limit: 60 km/h

Safety is in your hands!

The safety of road workers is all of our responsibility!
For the second year in a row, the European Association of Operators of Toll Road Infrastructures (ASECAP) is organizing the traffic safety campaign on June 20th, which draws attention to the protection of road workers. After several European countries, AKA Ltd. joined the campaign as well.

It’s been thirty years on M5 motorway

The concession contract on the financing, construction, maintenance and operation of the M5 motorway was signed thirty years ago. AKA Alföld Koncessziós Autópalya Zrt. has undertaken to operate and maintain the 156.5 km long motorway section connecting Budapest with the Röszke border between the 17+400- and 173+895-kilometre sections.

Accessibility