Road surface repair works will be carried out on the M5 Motorway at Röszke rest area located near chainage 173 between 10th July and 30th July 2024 in the direction of Budapest. During the road surface repair works the rest area and the petrol station will be partially accessible in accordance with the works scheduled. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.
During the first phase of the road surface repair works – between 10th and 17th July 2024 – entering the M5 Motorway from the Röszke rest area located near chainage 173 km in the direction of Budapest will be possible at the roundabout of the number 5 main road.
In the second phase of the works – between 18th July and 30th July 2024 – the Röszke rest area and petrol station will be accessible via the offramp of the Szeged south interchange and turning back at the roundabout of the number 5 main road. Entering the motorway from the rest area will also be possible through the number 5 main road. Speed limits of 60 km/h and 80 km/h are to be expected within the aforementioned section. The repair works are expected to be completed by 30th July 2024.
Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website www.utinform.hu, and by AKA Ltd. on their website www.aka.hu as well as the operator – A-WAY Ltd.
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.
We wish you a safe trip!
AKA Ltd.
For further information and interviews please contact:
PResston PR
E-mail: info@presstonpr.hu
Terdik Adrienne, managing director
M: +36302576008, +36308316456
T: +3613259488