Road surface repair works will be carried out on the M5 Motorway in the proximity of Lajosmizse between 12th and 27th April 2024 in the direction of Szeged between chainage 59 and 60. During the road surface repair works, traffic will be diverted at the technical crossings between chainage 57 and 64. Two lanes are available for travelers twice in each direction, except during the installation and dismantling of the diversion. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.
The repairs will expectedly start on 12th April 2024 on the aforementioned section. During the road surface repair works on the M5 Motorway the traffic in the direction of Szeged between chainage 57 and 64 will be diverted into the fast lane and into the fast lane of the opposite side. The repair works are expected to be completed by 27th April 2024. Speed limits of 60 km/h and 80 km/h are to be expected within the aforementioned section.
Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website www.utinform.hu, and by AKA Ltd. on their website www.aka.hu as well as the operator – A-WAY Ltd.
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.
We wish you a safe trip!
AKA Ltd.
For further information and interviews please contact:
PResston PR
E-mail: info@presstonpr.hu
Terdik Adrienne, managing director
M: +36302576008, +36308316456
T: +3613259488