On the M5 Motorway in the direction of Szeged, the offramp of the Szeged west interchange at chainage 166 will expectedly be closed between 5th and 19th April 2024 due to road surface repair works. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.

During the road surface repair works on the M5 Motorway between 5th and 19th April 2024 the offramp of the Szeged west interchange at chainage 166 in the direction of Szeged will be closed. Leaving the M5 Motorway will be possible at the Szeged north  or Szeged south interchange. The repair works are expected to be completed by 19th April 2024. A speed limit of 100 km/h is to be expected within the aforementioned section. The restrictions will not affect the on- and offramp of the M5 Motorway in the direction of Budapest.

Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website www.utinform.hu, and by AKA Ltd. on their website www.aka.hu as well as the operator – A-WAY Ltd.
AKA Ltd. asks travelers to drive more carefully and pay attention to colleagues working in the diversion, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.

We wish you a safe trip!
AKA Ltd.

 

For further information and interviews please contact:

PResston PR

E-mail: info@presstonpr.hu
Terdik Adrienne, managing director
M: +36302576008, +36308316456
T: +3613259488

Accessibility