Road surface repair works will be carried out on the M5 Motorway at the Petőfiszállás rest area located near chainage 121 between 15th September and 7th October 2023 in the direction of Szeged. During the road surface repair works the rest area will be partially closed, while the petrol station will remain entirely available in accordance with the works scheduled. AKA Ltd. kindly asks road users to exercise patience due to the traffic restrictions caused by the repairs.

The repairs will expectedly start on 15th September 2023 at the aforementioned rest area. During the road surface repair works on the M5 Motorway the Petőfiszállás rest area located near chainage 121 km in the direction of Szeged will be partially closed. During the works the petrol station will remain accessible, the parking area for cars, buses and trucks will be partially available. A speed limit of 30 km/h is to be expected within the aforementioned section. The repair works are expected to be completed by 7th October 2023.

Information about current traffic restrictions and diversions will be continuously provided by Útinform on their website www.utinform.hu, and by AKA Ltd. on their website www.aka.hu as well as the operator – A-WAY Ltd. AKA Ltd. asks travelers to drive more carefully, keeping the speed limit on the M5 Motorway. Unforeseeable events may result in changes to the aforementioned schedule. AKA Ltd. reserves the right to modify the schedule of the maintenance works.

We wish you a safe trip!
AKA Ltd.

 

For further information and interviews please contact:

PResston PR

E-mail: info@presstonpr.hu
Terdik Adrienne, managing director
M: +36302576008, +36308316456
T: +3613259488

Accessibility