M5 Motorway is ready for winter maintenance
WINTER MAINTENANCE ON THE M5 MOTORWAY IN NUMBERS
156,6 km motorway section |
3 operation and maintenance centres (located near Újhartyán, Kiskunfélegyháza and Balástya) |
12 dual-purpose vehicles |
7 multifunctional Unimogs, 3 loading vechicles |
6234,47 tons of sodium chloride |
18 tons of calcium chloride |
Monitoring the road conditions every 2 hours during the daytime |
Kecskemét north interchange closure due to construction of the M44 Expressway
Type: | M5-M44 interchange construction works |
Location: | M5 motorway first in the direction of Budapest, then afterwards in the direction of Szeged, Kecskemét north interchange at chainage 74 |
Expected start of maintenance: | 10th October 2024 |
Expected finish of maintenance: | Autumn 2026 |
Speed limit: | 60 km/h |
M5 Motorway is ready for winter maintenance
WINTER MAINTENANCE ON THE M5 MOTORWAY IN NUMBERS
156,6 km motorway section |
3 operation and maintenance centres (located near Újhartyán, Kiskunfélegyháza and Balástya) |
12 dual-purpose vehicles |
7 multifunctional Unimogs, 3 loading vechicles |
6234,47 tons of sodium chloride |
18 tons of calcium chloride |
Monitoring the road conditions every 2 hours during the daytime |
Kecskemét north interchange closure due to construction of the M44 Expressway
Type: | M5-M44 interchange construction works |
Location: | M5 motorway first in the direction of Budapest, then afterwards in the direction of Szeged, Kecskemét north interchange at chainage 74 |
Expected start of maintenance: | 10th October 2024 |
Expected finish of maintenance: | Autumn 2026 |
Speed limit: | 60 km/h |
OPERATION
Our company guarantees high-standard and safe operation along the M5 Motorway between Budapest and Röszke 365 days a year. Professionals of AKA Ltd. and A-WAY Ltd. are responsible for your safety on and along the Motorway in the scope of duties listed below.
OPERATION
Our Company guarantees high-standard and safe operation along the M5 Motorway between Budapest and Röszke 365 days a year. Professionals of AKA Ltd. and A-WAY Ltd. are responsible for your safety on and along the Motorway in the scope of duties listed below.
Maintenance of the motorway,
small repairs and maintenance works
Continuous cultivating of the
vegetation along the motorway
Possible obstruction removal
within the shortest possible time
The maintenance of the
signing posts
Maintenance of the motorway,
small repairs and maintenance works
Continuous cultivating of the
vegetation along the motorwa
Possible obstruction removal
within the shortest possible time
The maintenance of the
signing posts
The maintenance of the motorway
establishment along the
Providing
road patrol services
Keeping clean
the Motorway
Winter operation –
de-icing, snow clearance
Daily routine duties
The maintenance of the motorway
establishment along the
Providing
road patrol services
Keeping clean
the Motorway
Winter operation –
de-icing, snow clearance
Daily routine duties
M5 ONLINE MAP
M5 ONLINE MAP
M5 METEOROLOGY
M5 METEOROLOGY
ROAD MANAGER CONSENT
ROAD MANAGER CONSENT
WEIGH STATION
WEIGH STATION
CCTV INFORMATION
CCTV INFORMATION
ABOUT US
The mission of the Concession Company, AKA Alföld Concession Company Ltd. is to finance, to build, to operate and to maintain the M5 Motorway between chainages 17+400 km and 173+895, which connects Budapest and Röszke state border and 156,5 km long. Between 1998 and 2006 there were three phases and for 2006 the full length of the motorway was handed over.
On the motorway covered by asphalt surface with 2×2 traffic lanes and an emergency lane, there are15 intersections and 111 pieces of well-preserved objects ensures safe traffic. For travellers there are 18 rest areas with several rest area services.
ABOUT US
The mission of the Concession Company, AKA Alföld Concession Company Ltd. is to finance, to build, to operate and to maintain the M5 Motorway between chainages 17+400 km and 173+895, which connects Budapest and Röszke state border and 156,5 km long. Between 1998 and 2006 there were three phases and for 2006 the full length of the motorway was handed over.
On the motorway covered by asphalt surface with 2×2 traffic lanes and an emergency lane, there are15 intersections and 111 pieces of well-preserved objects ensures safe traffic. For travellers there are 18 rest areas with several rest area services.